24' X 32' O-Gauge Train Layout  -  February 2008
The area of the layout where nothing is on this side of the river will eventually contain two mountains reaching near the ceiling. Within each mountain will be a helix and at some point the track will come out of the mountain and cross over on a trestle from one mountain to the other. It is planned for 2 or 3 Shay logging trains to worm in and out and around the two mountains. The exact manner or just how, Ray has no idea as yet.

A logging camp with the sawmill & log loader accessories will operate on the valley floor.

Menu - Photos Previous Photo Next Photo

[  Current Page - TOP  ] [   Menu - Main  ]